大神秦先生气质短发美女,秦先生九部短发视频大全,黑客家庭监控视频360


86-21-58999552

Better design better quality better solution

Transformer Testing and Measurement

Our advanced power and distribution transformer test system and components are used for testing transformer up to 1000kV/600MVA. Samgor perform the following tests in accordance with ANSI / IEEE C57.12.90 and IEC 76 latest edition standards.

Samgor can offer the turn-key project of the PTTS/DTTS power/distribution transformer test system mainly consists of the station design, type selection and purchase of special equipment, equipment installation and commissioning, system connection, system commissioning, transformer test, training of the testing personnel, etc. The station is applicable to all delivery tests, type tests and some special tests of transformers.

Samgor Technology is a single source supplier for power and distribution transformer test system , our large products range covers:

◆?Power Transformer Test System

?Mobile Power Transformer Test System

◆?Distribution Transformer Test System

◆?Transformer Loss Measuring System

◆?Electronics Power Sources?(SFC)

Cylinder Type?Test Systems

◆?AC Resonant Test Systems

主站蜘蛛池模板: 遂平县| 余干县| 大新县| 中阳县| 南投市| 平谷区| 玉林市| 化德县| 临沭县| 宾川县| 万全县| 泰顺县| 肇源县| 平江县| 东乡族自治县| 桃江县| 抚顺市| 晋中市| 衡东县| 固原市| 隆化县| 社会| 迁安市| 津南区| 尼勒克县| 彭泽县| 滦平县| 枝江市| 石台县| 辉南县| 库车县| 宜城市| 凤庆县| 永安市| 工布江达县| 昌平区| 武山县| 汤原县| 大同县| 财经| 三亚市|